Tender Corrigendum :
|
Tender Corrigendum | Deadline has been changes from Oct 19 2022 12:00AM to Jan 13 2023 12:00AM Date | Tender Corrigendum Publication | Company Web Site - Internet | Tender Corrigendum Document | Can be download by Subscribers | Tender Corrigendum Publication | Company Web Site - Internet | Tender Corrigendum Document | Can be download by Subscribers |
|
Product Detail :
|
Supply of fixed bullet camera , router , external mic sensor , fixed dome camera , l2 switch 24 port poe plus , vms channel license , workstation with monitor 21 inch , display 42 inch , vms base license , server and recording storage average 150 tb usable , l2 switch 12 port poe plus , l2 switch 8 port poe plus , nvr with 50 tb usable storage , ie switch l2 8 port poe plus , internal concealed cabling , nvr with 15 tb usable storage , nvr with 40 tb usable storage , utp cat 6 cable in mtr , server and storage with 120 tb usable storage , nvr with 60 tb usable storage , server and storage with 90 tb usable storage , utp patch cord 1 mtr , 24 port utp patch panel , display 32 inch , internal concealed cabling at the rate 40 mtr per camera lot , single port faceplate with keystone and gangbox , 24u rack with dual pdu and accessories , utp patch cord 2 mtr , non it table and chair , 9u rack with dual pdu and accessories , earthing , 15 u rack with dual pdu and accessories , air conditioner 1 ton , air conditioner 1.5 ton industrial grade , ups 4 hrs backup , solar system with 12 hrs backup and ups with half hour backup , biometric access control for server room , nms , project manager required during implementation phase , surveillance solution architect required during implementation phase , network engineer required during implementation phase , field engineer surveillance as required or lot bidder to propose no of resources in order to adhere to the timelines of the project required during implementation phase , commissioning engineer as required or lot bidder to propose no of resources in order to adhere to the timelines of the project required during implementation phase , documentation specialist required during implementation phase , project manager required during operation and maintenance phase , field engineer surveillance required during operation and maintenance phase , helpdesk engineers required during operation and maintenance phase , bandwidth 100 mbps at dhqs for 5 years i.e 60 months or as per requirement at each of the 78 location , bandwidth 12-20 mbps police stations for 5 years i.e 60 months or as per requirement at each of the 1779 location , operations cost for first year , operations cost for second year , operations cost for third year , operations and maintenance cost for fourth year , operations and maintenance cost for fifth year boq title supply installation maintenance and commissioning of cctv systems at all pss of up Qty 2788533
|
Tender Detail : |
Fixed Bullet Camera,router,external Mic Sensor,fix... |